Skip to content
Sections

Goulburn River Hybrid Project

Merriwa, New South Wales

Open listings on Goulburn River Hybrid Project

  • Solar Farm Constructions

    Piling Operator

    • Merriwa, NSW
    • 585 MW
    • $45 an hour + penalties
    • Casual
    • Camp accommodation
    10 days ago
  • DT Infrastructure

    WHSE Advisor

    • Merriwa, NSW
    • 585 MW
    • $168,000 a year
    • Full time
    • Camp accommodation
    13 days ago
  • A1 Earthworx

    Plant Operator

    • Merriwa, NSW
    • 585 MW
    • $40 an hour + penalties
    • Casual
    • 88 days
    • Camp accommodation
    16 days ago
  • A1 Earthworx

    Labourer

    • Merriwa, NSW
    • 585 MW
    • $40 an hour
    • Casual
    • 88 days
    • Camp accommodation
    20 days ago

About this project

A 585 MWdc solar farm with a battery energy storage system, developed by Lightsource bp between Wollar and Merriwa in the Upper Hunter region of New South Wales. Construction commenced in December 2024, with up to 350 construction roles over an anticipated 27-month build.

Keep looking

Goulburn River Hybrid Project — jobs and project detail