Civil labourers for the Civil W1 wave of Goulburn River Hybrid Project, a solar farm near Merriwa, New South Wales.
The role in detail
A1 Earthworx is recruiting for Goulburn River Hybrid Project, a solar farm near Merriwa, New South Wales, delivered by DT Infrastructure as EPC. This campaign recruits the labourers of the Civil W1 wave: earthworks, drainage, trenching and the pads and access roads the piling and mechanical fronts will follow.
What you will do
Work alongside plant operators and the leading hand on earthworks, drainage and trenching
Place and compact material and assist with the installation of pipes, pits and drainage
Install erosion and sediment controls and keep them maintained
Move materials, tools and equipment around the work area and keep work fronts and access roads clean and safe
You will need
Experience on civil or construction sites is preferred, but not required for every position
The physical fitness to perform repetitive outdoor construction work in a hot climate
A White Card
The ability to work effectively as part of a civil crew
About this campaign
This opening belongs to the Civil W1 wave of the Goulburn River Hybrid Project recruitment plan
The positions shown on this page represent recruitment across the campaign wave, not the number of workers on site at any one time.
Tickets & licences
White Card
Additional tickets are added only where the specific position requires them.
Pay & conditions
Employment: Casual
Pay: $40 an hour
Accommodation: Camp accommodation
Accommodation details: Roster: 14/7 DIDO from Sydney, Newcastle or Bathurst. Accommodation and meals provided; DIDO 14/7 from Sydney; Newcastle; Bathurst.