The employer is no longer taking applications for this listing. Here are comparable openings you can still apply to.
Applications close
14 April 2025
Positions filled
7 of 7
Start on site
3 March 2025
About the role
Piling rig operators for the tracker and battery foundations of SEC Renewable Energy Park – Horsham, a solar farm near Horsham, Victoria.
The role in detail
Pilecom is recruiting for SEC Renewable Energy Park – Horsham, a solar farm near Horsham, Victoria, delivered by OX2 as EPC. This campaign recruits the rig operators of the Piling W1 wave.
What you will do
Operate a pile-driving rig to install steel piles to the design depth, plumb and alignment
Work from the surveyor’s set-out and the piling crew’s marks
Carry out pre-start checks and daily maintenance and report faults
Record drive results and hand them to the inspector
You will need
Proven experience operating piling rigs, ideally on solar farms
The tickets for the plant you operate and a White Card
A driver’s licence
The care to hit tolerance on every pile: the tracker fixing that follows depends on it
About this campaign
This opening belongs to the Piling W1 wave of the SEC Renewable Energy Park – Horsham recruitment plan
The positions shown on this page represent recruitment across the campaign wave, not the number of workers on site at any one time.
Tickets & licences
White Card
Additional tickets are added only where the specific position requires them.
Pay & conditions
Employment: Casual
Pay: $45 an hour + penalties
Penalty rates: Yes — award penalty rates apply
Accommodation details: Roster: Mon–Fri; 10-hour days. Commutable from Horsham; no camp.