About the role
Civil labourers for the early works of Waroona Stage 1, a 132 MW solar and battery project in Waroona, WA, with TradeConnex supplying the civil crew.
The role in detail
TradeConnex is recruiting for Waroona Stage 1, a 132 MW solar farm with a battery energy storage system in Waroona, Western Australia, delivered by Monford Group as EPC. Mobilisation has started, and this campaign recruits the labourers of the civil crew: site preparation, access roads, drainage, trenching and the pads that turn a paddock into a construction site.
What you will do
- Work alongside plant operators and the leading hand on earthworks, drainage and trenching
- Place and compact material and assist with the installation of pipes, pits and drainage
- Install erosion and sediment controls and keep them maintained
- Move materials, tools and equipment around the work area and keep work fronts and access roads clean and safe
- Follow site safety, environmental and construction procedures
You will need
- Experience on civil or construction sites is preferred, but not required for every position
- The physical fitness to perform repetitive outdoor construction work in a hot climate
- The ability to work effectively as part of a civil crew
- Reliable transport or the ability to reach the project under the arrangements stated for the role
About this campaign
- This opening belongs to the Civil W1 wave of the Waroona Stage 1 recruitment plan
- Recruitment supports the civil construction phase of the project
- The positions shown on this page represent recruitment across the campaign wave, not the number of workers on site at any one time.
Tickets & licences
Additional tickets are added only where the specific position requires them.
Pay & conditions
- Employment: Casual
- Pay: $40 an hour
- Accommodation details: Roster: Project roster to be confirmed by employer. Commutable from Waroona, Harvey, Bunbury and Collie; no camp planned.