The employer is no longer taking applications for this listing. Here are comparable openings you can still apply to.
Applications close
22 September 2026
Positions filled
7 of 8
Start on site
1 September 2026
About the role
Electrical trade assistants for the BESS W1 wave of Goulburn River Hybrid Project, a solar farm near Merriwa, New South Wales.
The role in detail
DT Infrastructure is the EPC contractor on Goulburn River Hybrid Project, a solar farm near Merriwa, New South Wales. This campaign recruits the electrical trade assistants of the BESS W1 wave, in the battery yard.
What you will do
Pull and lay DC and LV cable between the battery enclosures, the inverters and the switchrooms
Assist with the mechanical installation of enclosures, busbars and cable supports under an electrician’s direction
Label, dress and secure cable and assist with terminations
Keep the electrical work front stocked, tidy and safe
You will need
Trade-assistant or construction experience; electrical, battery or solar experience is an advantage
The fitness for repetitive outdoor manual work
A White Card
The care to follow an electrician’s instructions exactly
About this campaign
This opening belongs to the BESS W1 wave of the Goulburn River Hybrid Project recruitment plan
The positions shown on this page represent recruitment across the campaign wave, not the number of workers on site at any one time.
Tickets & licences
White Card
First Aid
CPR
LVR
Additional tickets are added only where the specific position requires them.
Pay & conditions
Employment: Full time
Pay: $50 an hour
Accommodation: Camp accommodation
Accommodation details: Roster: 14/7 DIDO from Sydney, Newcastle or Bathurst. Accommodation and meals provided; DIDO 14/7 from Sydney; Newcastle; Bathurst.