The employer is no longer taking applications for this listing. Here are comparable openings you can still apply to.
Applications close
4 September 2026
Positions filled
5 of 5
Start on site
3 August 2026
About the role
Site surveyors for the set-out of Lower Wonga Hybrid Project, a solar farm near Woolooga, Queensland.
The role in detail
INTEC Energy Solutions is the EPC contractor on Lower Wonga Hybrid Project, a solar farm near Woolooga, Queensland. This campaign recruits the surveyors of the Civil W1 wave.
What you will do
Set out roads, pads, drainage, pile rows and cable routes from the design model
Run as-built and conformance surveys and hand the records to QA and to the engineers
Maintain the site control network and check it after every disturbance
Support the piling and mechanical crews with layout as their fronts open
You will need
A surveying qualification and experience on civil or renewable construction sites
Fluency with GNSS and total-station equipment and with the office software behind them
A White Card and a driver’s licence
Care with records: an as-built is a document the project keeps for decades
About this campaign
This opening belongs to the Civil W1 wave of the Lower Wonga Hybrid Project recruitment plan
The positions shown on this page represent recruitment across the campaign wave, not the number of workers on site at any one time.
Tickets & licences
White Card
Additional tickets are added only where the specific position requires them.
Pay & conditions
Employment: Full time
Pay: $135,000 a year
Accommodation details: Roster: Mon–Sat; 10-hour days. Gympie about 40 km away; no camp; transport to be arranged by the candidate.