The employer is no longer taking applications for this listing. Here are comparable openings you can still apply to.
Applications close
30 May 2025
Positions filled
1 of 1
Start on site
28 April 2025
About the role
Site surveyors for the set-out of Fulham Solar Farm and Battery, a solar and battery project near Sale, Victoria.
The role in detail
GRS is the EPC contractor on Fulham Solar Farm and Battery, a solar and battery project near Sale, Victoria. This campaign recruits the surveyors of the Civil W1 wave.
What you will do
Set out roads, pads, drainage, pile rows and cable routes from the design model
Run as-built and conformance surveys and hand the records to QA and to the engineers
Maintain the site control network and check it after every disturbance
Support the piling and mechanical crews with layout as their fronts open
You will need
A surveying qualification and experience on civil or renewable construction sites
Fluency with GNSS and total-station equipment and with the office software behind them
A White Card and a driver’s licence
Care with records: an as-built is a document the project keeps for decades
About this campaign
This opening belongs to the Civil W1 wave of the Fulham Solar Farm and Battery recruitment plan
The positions shown on this page represent recruitment across the campaign wave, not the number of workers on site at any one time.
Tickets & licences
White Card
Additional tickets are added only where the specific position requires them.
Pay & conditions
Employment: Full time
Pay: $135,000 a year
Accommodation details: Roster: Mon–Fri; 10-hour days. Commutable from Sale / Traralgon; no camp.