Jobs by state
SEC Renewable Energy Park – Horsham
Horsham, Victoria
- 119 MW
- 200 MWh storage
- Commissioning
Open listings on SEC Renewable Energy Park – Horsham
No live opening on this project right now. Any listing attached to it appears on this page.
About this project
A 119 MW solar farm with a 100 MW two-hour battery near Horsham, Victoria, owned by the SEC (State Electricity Commission of Victoria) and built with developer OX2. The solar farm connected to the grid in September 2026; the battery is to be installed later in 2026 and the SEC expects commercial operation in 2027.
