Skip to content
Sections

Lower Wonga Hybrid Project

Lower Wonga, Queensland

Open listings on Lower Wonga Hybrid Project

  • BAM BAM Pile Driving

    Labourer

    • Woolooga, QLD
    • 380 MW
    • $36 an hour + penalties
    • Casual
    • 88 days
    3 days ago
  • BAM BAM Pile Driving

    Piling Operator

    • Woolooga, QLD
    • 380 MW
    • $45 an hour + penalties
    • Casual
    17 days ago
  • BAM BAM Pile Driving

    Labourer

    • Woolooga, QLD
    • 380 MW
    • $36 an hour + penalties
    • Casual
    • 88 days
    1 month ago

About this project

A solar farm of approximately 380 MWdc with a 281 MW / 843 MWh battery, developed by Lightsource bp next to the Woolooga substation at Lower Wonga, near Gympie, Queensland. Construction began in 2026 with a joint venture of INTEC Energy Solutions and Gotion Hi-Tech Australia as EPC partner; the developer expects the project to be operational in late 2028.

Keep looking