The employer is no longer taking applications for this listing. Here are comparable openings you can still apply to.
Applications close
20 June 2025
Positions filled
5 of 5
Start on site
19 May 2025
About the role
A leading hand to run the civil crew of Maryvale Solar and Energy Storage, a solar and battery project near Wellington, New South Wales.
The role in detail
A1 Earthworx is recruiting for Maryvale Solar and Energy Storage, a solar and battery project near Wellington, New South Wales, delivered by PCL Construction as EPC. This campaign recruits the leading hands of the Civil W1 wave, working alongside the crew they lead.
What you will do
Lead the crew on the work front, working alongside them
Allocate the day’s tasks, tools and materials and keep the work fronts moving
Run pre-starts and take-fives with the crew and report hazards and progress upward
Check the quality of what the crew places before the inspector does
You will need
Construction experience with time spent leading a small crew
A White Card and a driver’s licence
Clear communication with a crew and with supervision, in both directions
The judgement to stop a task that is not safe or not right
About this campaign
This opening belongs to the Civil W1 wave of the Maryvale Solar and Energy Storage recruitment plan
The positions shown on this page represent recruitment across the campaign wave, not the number of workers on site at any one time.
Tickets & licences
White Card
Additional tickets are added only where the specific position requires them.
Pay & conditions
Employment: Casual
Pay: $44 an hour + penalties
Penalty rates: Yes — award penalty rates apply
Accommodation: Help finding a place
Accommodation details: Roster: DIDO; Mon–Sat. Accommodation assistance depending on the role; DIDO from Dubbo / Orange.