The employer is no longer taking applications for this listing. Here are comparable openings you can still apply to.
Applications close
16 October 2026
Positions filled
8 of 8
Start on site
14 September 2026
About the role
Plant operators for the earthworks of Waroona Renewable Energy Project Stage 1, a solar farm near Waroona, Western Australia.
The role in detail
Monford Group is the EPC contractor on Waroona Renewable Energy Project Stage 1, a solar farm near Waroona, Western Australia. This campaign recruits the plant operators of the Civil W1 wave, on the bulk earthworks, roads, pads and cable trenches of the site.
What you will do
Operate excavators, graders, rollers, water carts or articulated dump trucks on earthworks
Cut, fill, trim and compact to the survey set-out and the engineer’s levels
Trench and backfill for cable routes and drainage
Complete pre-start checks and report defects rather than working around them
You will need
Competency tickets for the plant you operate and proven hours on civil earthworks
A White Card and a driver’s licence
An eye for levels and finished surfaces, and respect for the survey pegs
The habit of working safely around people, services and other machines
About this campaign
This opening belongs to the Civil W1 wave of the Waroona Renewable Energy Project Stage 1 recruitment plan
The positions shown on this page represent recruitment across the campaign wave, not the number of workers on site at any one time.
Tickets & licences
White Card
Additional tickets are added only where the specific position requires them.
Pay & conditions
Employment: Casual
Pay: $42 an hour + penalties
Penalty rates: Yes — award penalty rates apply
Accommodation details: Roster: Roster to be confirmed by the employer. Commutable from Waroona / Harvey / Bunbury / Collie; no camp.