Equans Solar & Storage + Bouygues Construction Australia JV
Culcairn, NSW
Full time
$135,000 a year
This position has been filled
The employer is no longer taking applications for this listing. Here are comparable openings you can still apply to.
Applications close
3 May 2024
Positions filled
5 of 5
Start on site
1 April 2024
About the role
Site surveyors for the set-out of Culcairn Solar Farm, a solar farm near Culcairn, New South Wales.
The role in detail
Equans Solar & Storage + Bouygues Construction Australia JV is the EPC contractor on Culcairn Solar Farm, a solar farm near Culcairn, New South Wales. This campaign recruits the surveyors of the Civil W1 wave.
What you will do
Set out roads, pads, drainage, pile rows and cable routes from the design model
Run as-built and conformance surveys and hand the records to QA and to the engineers
Maintain the site control network and check it after every disturbance
Support the piling and mechanical crews with layout as their fronts open
You will need
A surveying qualification and experience on civil or renewable construction sites
Fluency with GNSS and total-station equipment and with the office software behind them
A White Card and a driver’s licence
Care with records: an as-built is a document the project keeps for decades
About this campaign
This opening belongs to the Civil W1 wave of the Culcairn Solar Farm recruitment plan
The positions shown on this page represent recruitment across the campaign wave, not the number of workers on site at any one time.
Tickets & licences
White Card
Additional tickets are added only where the specific position requires them.
Pay & conditions
Employment: Full time
Pay: $135,000 a year
Accommodation details: Roster: Mon–Fri 07:00–16:45; Sat 08:00–12:00 — bus from Albury/Wodonga. Bus from Albury/Wodonga; no camp.