Skip to content
Sections

Electrician – Jinbi Solar Project Stage 1

Mass Energy

  • Karratha, WA
  • Casual
  • $66 an hour
  • Camp accommodation

About the role

Licensed electricians for the Electrical W1 wave of Jinbi Solar Project Stage 1, a solar farm near Karratha, Western Australia.

The role in detail

Mass Energy is recruiting for Jinbi Solar Project Stage 1, a solar farm near Karratha, Western Australia, delivered by DT Infrastructure as EPC. This campaign recruits the electricians of the Electrical W1 wave.

What you will do

  • Terminate and test module strings, harnesses and combiner boxes
  • Install and terminate LV cable to the inverter stations and complete the test records
  • Direct trade assistants on cable pulling and dressing
  • Complete the inspection and test records the commissioning team will rely on

You will need

  • An electrical licence recognised in Western Australia
  • Solar farm, battery or industrial electrical experience is an advantage
  • A White Card and a driver’s licence
  • The discipline to test and record every circuit you close

About this campaign

  • This opening belongs to the Electrical W1 wave of the Jinbi Solar Project Stage 1 recruitment plan
  • The positions shown on this page represent recruitment across the campaign wave, not the number of workers on site at any one time.

Tickets & licences

  • White Card
  • First Aid
  • CPR
  • LVR
  • Electrical Licence

Additional tickets are added only where the specific position requires them.

Pay & conditions

  • Employment: Casual
  • Pay: $66 an hour
  • Accommodation: Camp accommodation
  • Accommodation details: Roster: 2:1 FIFO from Perth. Rapid Camps camp with meals; FIFO from Perth, 2:1 roster.

Comparable openings

  • Electrician

    Haynes People

    • Tom Price, WA
    • 440 MW
    • $54 an hour + penalties
    • Casual
    • Camp accommodation
    • First Aid
    • CPR
    • +2
    4 days ago
  • Electrical Trade Assistant

    Sterling and Wilson Renewable Energy

    • Port Hedland, WA
    • 690 MW
    • $54 an hour
    • Casual
    • 88 days
    • Camp accommodation
    • First Aid
    • +2
    4 days ago

Browse all solar farm jobs in Australia